M&S Liverpool St

Careful planning was essential on this project, due to the condition of the concrete slab, which meant significant floor preparation was necessary.

As to avoid the common problems of clearing areas for other trades, and to keep the project on schedule, we carried out all the flooring works throughout the night.

The project was completed after 3 nights of up-lift, subfloor preparation, and the installation of Tarkett Summer which was laid brick bond.

Polysafe Vogue was installed to the Back of House areas including cove skirting’s, bringing the total project to just under 400m2.

© Copyright 2017 The Flooring Co | Web design by Shaun Power Design