Kings College Hospital

It was extremely important to the Client that there were no delays incurred on this project even though it grew in size considerably from the original tender document. We initially had to make levels up to a maximum of 30mm using F Balls Stopgap 600 Basecoat before applying a diluted mix (4:1) of P131 Primer and a 3mm finish coat of F Balls Stopgap 300 Smoothing Compound ready to receive resilient floor coverings.

We then supplied and installed Polyflor Wood FX to communal areas including welded joints and silicone sealant to perimeter edges.

All Wet Rooms were installed with 100mm Self-Cove.

All works were completed out-of-hours in order to cause minimum disruption to other trades. The project was completed on time and on budget.